ECOMAX 33 modular co-generation system by AB Energy

Primor Factory – Kibbutz Gan Shmuel

Performed by the Iteeo, A member of the El-Mor Group.

General description of the project.

AB Energy Modular unit ECOMAX 33, supplied as a complete unit that includes all components required to operate the system (including: steam production system, heat exchangers, synchronization systems, natural gas systems, compressor, ventilation systems, control and monitoring systems, oil systems and refrigeration water (including refill pumps), electrical panels and switches, ignition battery, a gas emission system including a catalytic converter, acoustic walls for noise reduction as part of the unit’s body, a fire alarm system ..) and all in accordance with the standards required in Israel

Electric power supply

3.3 MW

Thermal heat use

Steam production: 1.7 Ton / h , steam pressure 13 bar, 195⁰C steam outlet temperature.
Pre-heating of treated feed water to produce steam with heat exchanger of 108 kW
Engine type

Natural gas engine manufactured by Jenbacher

Year of establishment

2019

Service and maintenance

Complete preventive and corrective maintenance – done by a local Israeli team of AB Energy Israel

System monitoring

Monitoring the system 24×7 by AB Energy’s global control room that located in northern Italy

Back to Selected Projects